New: Earn 20% as an AgentAlley affiliate. Share your link and earn on every sale you refer. Join now New: Earn 20% as an affiliate. Join now

Design a structured onboarding experience that gets new team

Team onboarding playbook

by rampstackco · MIT license · ★ 901 on GitHub · updated Sep 15

Team onboarding playbook cover

Design a structured onboarding experience that gets new team members productive in 30, 60, and 90 days. Use when a new hire is joining, when contractors or agency partners need to ramp up, when an existing team is restructuring and…

---
name: team-onboarding-playbook
description: Design a structured onboarding experience that gets new team members productive in 30, 60, and 90 days. Use when a new hire is joining, when contractors or agency partners need to ramp up, when an existing team is restructuring and members are switching focus, or when current onboarding feels chaotic and slow. Also triggers when one person owns all the tribal knowledge and you need to capture it, when you keep losing people in their first 90 days, or when a new project has many fresh members joining at once. Useful for engineering, design, product, marketing, and operations roles.
category: process-and-team
catalog_summary: "30-60-90 onboarding plans for new hires and contractors"
display_order: 4
---

A repeatable framework for building an onboarding playbook that ramps new team members predictably without burning out the people training them.

## When to use

- A new hire is joining and you do not have a written onboarding plan.
- An existing onboarding process is informal and inconsistent.
- A team is growing fast and onboarding is the bottleneck.
- A contractor or agency partner needs to ramp up quickly.
- A team member is leaving and their knowledge needs capturing.
- Onboarding currently takes too long and you want to reduce it.

Overview

A repeatable framework for building an onboarding playbook that ramps new team members predictably without burning out the people training them.

What you get

  • Pre-day-1 checklistaccounts, hardware, access, buddy assignment, welcome message.
  • Day-1 schedulemeeting list, intros, first deliverable.
  • First-week reading list5-10 curated, annotated docs.
  • 30/60/90 milestonesthe explicit checkpoints for this role.
  • Buddy guidewhat is expected of the onboarding partner.
  • Manager check-in cadencescheduled 1:1s and milestone reviews.
Manual install (npx, ZIP)
Claude Codenpx skills add rampstackco/claude-skills --skill team-onboarding-playbook -g -a claude-code
Claude Code (manual)mkdir -p ~/.claude/skills && curl -sL https://codeload.github.com/rampstackco/claude-skills/tar.gz/3d4510a94a76 \ | tar -xz -C ~/.claude/skills --strip-components=2 claude-skills-3d4510a94a76/skills/team-onboarding-playbook
Windows (PowerShell)New-Item -ItemType Directory -Force "$HOME\.claude\skills" | Out-Null; Invoke-WebRequest "https://m.agentalley.io/zip/68b468c23fc62a2a601f/team-onboarding-playbook.zip" -OutFile "$env:TEMP\team-onboarding-playbook.zip"; Expand-Archive "$env:TEMP\team-onboarding-playbook.zip" -DestinationPath "$HOME\.claude\skills" -Force
Claude.ai / desktopDownload the ZIP and upload it under Settings → Capabilities → Skills.
Codex, Cursor, other agentsPoint them at SKILL.md. The other files are plain text.

Connects with Agent Alley MCP · agentalley.io/mcp

Files included

  • SKILL.md8.9 KB
  • references/1 file · 6.8 KB
Read the files here
rampstackco/3d4510a2 files
SKILL.md
Show the full text190 lines

A repeatable framework for building an onboarding playbook that ramps new team members predictably without burning out the people training them.

When to use

  • A new hire is joining and you do not have a written onboarding plan.
  • An existing onboarding process is informal and inconsistent.
  • A team is growing fast and onboarding is the bottleneck.
  • A contractor or agency partner needs to ramp up quickly.
  • A team member is leaving and their knowledge needs capturing.
  • Onboarding currently takes too long and you want to reduce it.

When NOT to use

  • For ongoing performance management (different problem).
  • For training on a specific technology (use targeted docs and tutorials).
  • For documentation strategy in general (use documentation-strategy).
  • For role definition or hiring (different upstream problem).

Required inputs

  • The role: what the person will do, what success looks like at 90 days.
  • Existing artifacts: docs, runbooks, codebases, design files.
  • The team: who will mentor, who will pair, who answers what kind of question.
  • Tools and access: what accounts and systems the new person needs.
  • Time budget: how much time team members can invest in onboarding.

The framework

A good onboarding plan operates on 4 layers. Build all four.

Layer 1: Belonging (Day 1 to Week 1)

The first week is mostly about belonging, not productivity. Get this right and everything else accelerates.

  • Welcome message before they start.
  • Workspace and accounts ready before day 1. No "we will get to that".
  • A buddy or onboarding partner assigned (someone other than the manager).
  • Day 1 schedule that is not 8 hours of meetings, but is also not zero meetings.
  • Introductions to the people they will work with regularly.
  • A first-week rhythm: daily check-in with manager or buddy.
Layer 2: Context (Week 1 to Week 4)

The next phase is context. The new person needs to understand the system before they can change it.

  • The product or business: what we do, who we serve, why we exist.
  • The team: who owns what, how decisions get made.
  • The technical or operational landscape: the architecture diagram, the main tools, the key files.
  • The recent past: major decisions, recent launches, current priorities.
  • Active projects: what is in flight and how it fits.

A reading list is part of this. Keep it short. Annotated. Curated.

Layer 3: Contribution (Week 2 to Week 6)

By week 2 or 3, the new person should be making real contributions. Not because they are fully ramped, but because contribution is how ramping happens.

  • A first task that is small, scoped, and shippable in week 2.
  • Pairing or shadowing on a real piece of work in week 3.
  • Independent ownership of a small project by week 4 or 5.
  • Code review, design critique, or equivalent peer feedback from the start.

The first task matters. Pick something that touches the main systems but cannot break anything important. Something that ships gives confidence and visibility.

Layer 4: Mastery (Month 2 to Month 3)

By the end of 90 days, the new person should be a full member of the team.

  • Owning a project end to end.
  • On-call or on-rotation if the team has one.
  • Contributing to roadmap discussions, not just executing them.
  • Mentoring or supporting the next new hire.

90 days is a checkpoint, not a finish line. Document what worked and what was missing for the next person.

The 30/60/90 plan

Every onboarding plan should have explicit milestones at 30, 60, and 90 days.

30 days
  • Workspace, tools, and access fully set up.
  • Has met every team member.
  • Understands the product, the team, and the recent context.
  • Has shipped or contributed to at least one real piece of work.
  • Has a clear picture of their first major project or area.
60 days
  • Owns a project or area independently.
  • Knows where to find answers without asking every time.
  • Has formed working relationships beyond the immediate team.
  • Has made at least one meaningful improvement to a process, doc, or codebase.
90 days
  • Fully productive in the role.
  • Participating in roadmap and planning discussions.
  • Capable of training the next new hire on parts of the system.
  • Comfortable raising concerns and pushing back.

If someone is significantly behind these markers at the 30/60/90 checkpoints, address it directly. Either the plan is wrong, the support is wrong, or the role fit is wrong. Hoping it resolves itself does not work.

The role-specific overlay

The framework above applies to every role. The specifics differ.

Engineering
  • Day 1: dev environment running, first commit (a docs fix or trivial change).
  • Week 1: read the architecture doc, read the main service code paths.
  • Week 2: ship a small bug fix or refactor.
  • Week 4: own a feature or component.
  • Month 2: on-call shadow, then on-call.
Design
  • Day 1: design tools set up, design system access, brand guidelines reviewed.
  • Week 1: studio crit and design review participation.
  • Week 2: own a small surface (a setting page, an empty state).
  • Week 4: lead a design review for a feature in flight.
  • Month 2: own a feature design end to end.
Product
  • Day 1: read the strategy doc, the roadmap, and the latest 3 PRDs.
  • Week 1: shadow customer calls, attend support sync, join standup of all relevant teams.
  • Week 2: write a discovery doc or competitive analysis.
  • Week 4: own a feature spec.
  • Month 2: own a roadmap area.
Marketing or content
  • Day 1: brand voice doc, recent campaigns, top performing content.
  • Week 1: customer research artifacts and persona docs.
  • Week 2: ship a small piece of content (a social post, a blog edit).
  • Week 4: own a content piece end to end.
  • Month 2: own a campaign or channel.

Adapt to your role and stack. The shape stays the same.

Workflow

  1. Start the playbook before the new person arrives. Do not write it on day 1.
  2. Pre-stage accounts, hardware, and access. This is the most common day-1 failure point.
  3. Assign a buddy. Tell the buddy what is expected of them.
  4. Send the welcome message and the day-1 schedule before they start.
  5. Run the first week with a focus on belonging and context, not output.
  6. Check in daily for the first week, weekly for the first month.
  7. Run formal 30/60/90 check-ins with explicit milestones.
  8. After 90 days, do a retrospective: what worked, what was missing.
  9. Update the playbook based on the retrospective. Onboarding is a living doc.

Failure patterns

  • No plan. Day 1 with no schedule, no laptop, no accounts. Sets a tone.
  • Drinking from a firehose. 8 hours of meetings on day 1. People remember nothing.
  • No real work for too long. Three weeks of "reading docs" is demoralizing. Ship something small early.
  • All buddy, no manager. Buddies are great but cannot evaluate or advocate. Manager is still on the hook.
  • Tribal knowledge as gating. "Just ask Sara if you have questions" works until Sara is on vacation. Document the answers Sara keeps giving.
  • No 30/60/90 milestones. Onboarding "ends" when someone seems busy. That is not a milestone.
  • Generic plan for every role. Engineering and marketing have different first-week needs. Use the role overlay.
  • No retrospective. The same gaps catch every new hire because nobody updated the playbook.
  • Buddy with no time. Assigning a buddy who is also drowning is a recipe for poor onboarding and burnout. Protect their time.
  • Skipping the customer or product context. Engineers who do not know who the customer is build the wrong things. Marketers who do not know how the product works write thin copy.

Output format

Deliverables:

  1. Pre-day-1 checklist: accounts, hardware, access, buddy assignment, welcome message.
  2. Day-1 schedule: meeting list, intros, first deliverable.
  3. First-week reading list: 5-10 curated, annotated docs.
  4. 30/60/90 milestones: the explicit checkpoints for this role.
  5. Buddy guide: what is expected of the onboarding partner.
  6. Manager check-in cadence: scheduled 1:1s and milestone reviews.
  7. Retrospective template: to fill out at 90 days for next-time improvement.

Reference files

1---
2name: team-onboarding-playbook
3description: Design a structured onboarding experience that gets new team members productive in 30, 60, and 90 days. Use when a new hire is joining, when contractors or agency partners need to ramp up, when an existing team is restructuring and members are switching focus, or when current onboarding feels chaotic and slow. Also triggers when one person owns all the tribal knowledge and you need to capture it, when you keep losing people in their first 90 days, or when a new project has many fresh members joining at once. Useful for engineering, design, product, marketing, and operations roles.
4category: process-and-team
5catalog_summary: "30-60-90 onboarding plans for new hires and contractors"
6display_order: 4
7---
8 
9A repeatable framework for building an onboarding playbook that ramps new team members predictably without burning out the people training them.
10 
11## When to use
12 
13- A new hire is joining and you do not have a written onboarding plan.
14- An existing onboarding process is informal and inconsistent.
15- A team is growing fast and onboarding is the bottleneck.
16- A contractor or agency partner needs to ramp up quickly.
17- A team member is leaving and their knowledge needs capturing.
18- Onboarding currently takes too long and you want to reduce it.
19 
20## When NOT to use
21 
22- For ongoing performance management (different problem).
23- For training on a specific technology (use targeted docs and tutorials).
24- For documentation strategy in general (use `documentation-strategy`).
25- For role definition or hiring (different upstream problem).
26 
27## Required inputs
28 
29- The role: what the person will do, what success looks like at 90 days.
30- Existing artifacts: docs, runbooks, codebases, design files.
31- The team: who will mentor, who will pair, who answers what kind of question.
32- Tools and access: what accounts and systems the new person needs.
33- Time budget: how much time team members can invest in onboarding.
34 
35## The framework
36 
37A good onboarding plan operates on 4 layers. Build all four.
38 
39### Layer 1: Belonging (Day 1 to Week 1)
40 
41The first week is mostly about belonging, not productivity. Get this right and everything else accelerates.
42 
43- Welcome message before they start.
44- Workspace and accounts ready before day 1. No "we will get to that".
45- A buddy or onboarding partner assigned (someone other than the manager).
46- Day 1 schedule that is not 8 hours of meetings, but is also not zero meetings.
47- Introductions to the people they will work with regularly.
48- A first-week rhythm: daily check-in with manager or buddy.
49 
50### Layer 2: Context (Week 1 to Week 4)
51 
52The next phase is context. The new person needs to understand the system before they can change it.
53 
54- The product or business: what we do, who we serve, why we exist.
55- The team: who owns what, how decisions get made.
56- The technical or operational landscape: the architecture diagram, the main tools, the key files.
57- The recent past: major decisions, recent launches, current priorities.
58- Active projects: what is in flight and how it fits.
59 
60A reading list is part of this. Keep it short. Annotated. Curated.
61 
62### Layer 3: Contribution (Week 2 to Week 6)
63 
64By week 2 or 3, the new person should be making real contributions. Not because they are fully ramped, but because contribution is how ramping happens.
65 
66- A first task that is small, scoped, and shippable in week 2.
67- Pairing or shadowing on a real piece of work in week 3.
68- Independent ownership of a small project by week 4 or 5.
69- Code review, design critique, or equivalent peer feedback from the start.
70 
71The first task matters. Pick something that touches the main systems but cannot break anything important. Something that ships gives confidence and visibility.
72 
73### Layer 4: Mastery (Month 2 to Month 3)
74 
75By the end of 90 days, the new person should be a full member of the team.
76 
77- Owning a project end to end.
78- On-call or on-rotation if the team has one.
79- Contributing to roadmap discussions, not just executing them.
80- Mentoring or supporting the next new hire.
81 
8290 days is a checkpoint, not a finish line. Document what worked and what was missing for the next person.
83 
84## The 30/60/90 plan
85 
86Every onboarding plan should have explicit milestones at 30, 60, and 90 days.
87 
88### 30 days
89 
90- Workspace, tools, and access fully set up.
91- Has met every team member.
92- Understands the product, the team, and the recent context.
93- Has shipped or contributed to at least one real piece of work.
94- Has a clear picture of their first major project or area.
95 
96### 60 days
97 
98- Owns a project or area independently.
99- Knows where to find answers without asking every time.
100- Has formed working relationships beyond the immediate team.
101- Has made at least one meaningful improvement to a process, doc, or codebase.
102 
103### 90 days
104 
105- Fully productive in the role.
106- Participating in roadmap and planning discussions.
107- Capable of training the next new hire on parts of the system.
108- Comfortable raising concerns and pushing back.
109 
110If someone is significantly behind these markers at the 30/60/90 checkpoints, address it directly. Either the plan is wrong, the support is wrong, or the role fit is wrong. Hoping it resolves itself does not work.
111 
112## The role-specific overlay
113 
114The framework above applies to every role. The specifics differ.
115 
116### Engineering
117 
118- Day 1: dev environment running, first commit (a docs fix or trivial change).
119- Week 1: read the architecture doc, read the main service code paths.
120- Week 2: ship a small bug fix or refactor.
121- Week 4: own a feature or component.
122- Month 2: on-call shadow, then on-call.
123 
124### Design
125 
126- Day 1: design tools set up, design system access, brand guidelines reviewed.
127- Week 1: studio crit and design review participation.
128- Week 2: own a small surface (a setting page, an empty state).
129- Week 4: lead a design review for a feature in flight.
130- Month 2: own a feature design end to end.
131 
132### Product
133 
134- Day 1: read the strategy doc, the roadmap, and the latest 3 PRDs.
135- Week 1: shadow customer calls, attend support sync, join standup of all relevant teams.
136- Week 2: write a discovery doc or competitive analysis.
137- Week 4: own a feature spec.
138- Month 2: own a roadmap area.
139 
140### Marketing or content
141 
142- Day 1: brand voice doc, recent campaigns, top performing content.
143- Week 1: customer research artifacts and persona docs.
144- Week 2: ship a small piece of content (a social post, a blog edit).
145- Week 4: own a content piece end to end.
146- Month 2: own a campaign or channel.
147 
148Adapt to your role and stack. The shape stays the same.
149 
150## Workflow
151 
1521. Start the playbook before the new person arrives. Do not write it on day 1.
1532. Pre-stage accounts, hardware, and access. This is the most common day-1 failure point.
1543. Assign a buddy. Tell the buddy what is expected of them.
1554. Send the welcome message and the day-1 schedule before they start.
1565. Run the first week with a focus on belonging and context, not output.
1576. Check in daily for the first week, weekly for the first month.
1587. Run formal 30/60/90 check-ins with explicit milestones.
1598. After 90 days, do a retrospective: what worked, what was missing.
1609. Update the playbook based on the retrospective. Onboarding is a living doc.
161 
162## Failure patterns
163 
164- **No plan.** Day 1 with no schedule, no laptop, no accounts. Sets a tone.
165- **Drinking from a firehose.** 8 hours of meetings on day 1. People remember nothing.
166- **No real work for too long.** Three weeks of "reading docs" is demoralizing. Ship something small early.
167- **All buddy, no manager.** Buddies are great but cannot evaluate or advocate. Manager is still on the hook.
168- **Tribal knowledge as gating.** "Just ask Sara if you have questions" works until Sara is on vacation. Document the answers Sara keeps giving.
169- **No 30/60/90 milestones.** Onboarding "ends" when someone seems busy. That is not a milestone.
170- **Generic plan for every role.** Engineering and marketing have different first-week needs. Use the role overlay.
171- **No retrospective.** The same gaps catch every new hire because nobody updated the playbook.
172- **Buddy with no time.** Assigning a buddy who is also drowning is a recipe for poor onboarding and burnout. Protect their time.
173- **Skipping the customer or product context.** Engineers who do not know who the customer is build the wrong things. Marketers who do not know how the product works write thin copy.
174 
175## Output format
176 
177Deliverables:
178 
1791. **Pre-day-1 checklist**: accounts, hardware, access, buddy assignment, welcome message.
1802. **Day-1 schedule**: meeting list, intros, first deliverable.
1813. **First-week reading list**: 5-10 curated, annotated docs.
1824. **30/60/90 milestones**: the explicit checkpoints for this role.
1835. **Buddy guide**: what is expected of the onboarding partner.
1846. **Manager check-in cadence**: scheduled 1:1s and milestone reviews.
1857. **Retrospective template**: to fill out at 90 days for next-time improvement.
186 
187## Reference files
188 
189- [`references/onboarding-checklist.md`](references/onboarding-checklist.md): A day-by-day, week-by-week checklist for the first 30 days, with role-specific variants and a 30/60/90 review template.
190 
View all files on GitHub →

Details

Updated
Sep 15, 2026
License
MIT
Stars on the repo
★ 901
Checked
Source
rampstackco/claude-skills ↗
Creator
rampstackco · 60 listings
View creator

Made with team-onboarding-playbook

Team onboarding playbook — Showcase grid filtered by Tone equals Provocative and Sensory equals Resonant, showing eight matching brand cards with… (from the rampstackco/claude-skills README)
Team onboarding playbook — Showcase grid filtered by Tone equals Provocative and Sensory equals Resonant, showing eight matching brand cards with… (from the rampstackco/claude-skills README)

by rampstackco

Team onboarding playbook — Showcase grid with all four axis filters set to Provocative, Editorial Restrained, Coach, and Resonant, showing zero… (from the rampstackco/claude-skills README)
Team onboarding playbook — Showcase grid with all four axis filters set to Provocative, Editorial Restrained, Coach, and Resonant, showing zero… (from the rampstackco/claude-skills README)

by rampstackco

Team onboarding playbook — RampStack architecture diagram. A central navy hub card shows the RampStack mark with the subtitle 'Stack-agnostic… (from the rampstackco/claude-skills README)
Team onboarding playbook — RampStack architecture diagram. A central navy hub card shows the RampStack mark with the subtitle 'Stack-agnostic… (from the rampstackco/claude-skills README)

by rampstackco

Similar skills

See all →
MCP3-5 days | Agents: 6 | Gate Keepers: DevOps Automator +⚙️ Phase 2 Playbook — Foundation & Scaffoldingmsitarzewski/agency-agents · by msitarzewski> Duration: 3-5 days | Agents: 6 | Gate Keepers: DevOps Automator + Evidence Collector★ 154k GitHub starsMCPNEXUS transforms The Agency's independent AI specialists🌐 NEXUS — Network of EXperts, Unified in Strategymsitarzewski/agency-agents · by msitarzewski> NEXUS transforms The Agency's independent AI specialists into a synchronized intelligence network. This is not a prompt collection — it…★ 154k GitHub starsSkillGenerate an Ansoff Matrix analysis mapping growth strategiesphuryn/pm-skills · by phurynGenerate an Ansoff Matrix analysis mapping growth strategies across market penetration, market development, product development, and diversification. Use when considering growth options, planning market expansion, or evaluating strategic growth paths.★ 26.6k GitHub starsSkillSurvey any codebase as a senior advisorImproveshadcn/improve · by shadcnSurvey any codebase as a senior advisor and produce prioritized, self-contained implementation plans for OTHER models/agents to execute. Strictly read-only on source code — never implements, fixes, or refactors anything itself. Use when asked to audit a codebase, find improvement opportunities (bugs, security, performance, test coverage, tech debt, migrations, DX), suggest features or where to take the project next (roadmap, product direction), or generate handoff plans for another agent to implement.★ 9.2k GitHub starsSkillTranslate skills from one industry to anotherCareer changer translatorParamchoudhary/ResumeSkills · by ParamchoudharyTranslate skills from one industry to another, identify transferable skills★ 2.4k GitHub starsSkillA collection of 37 battle-tested marketing skillsOpenClaw Marketing SkillsLeoYeAI/openclaw-marketing-skills · by LeoYeAIA collection of 37 battle-tested marketing skills for OpenClaw agents. Use when you want to install or reference any marketing skill including: CRO (page-cro, signup-flow-cro, onboarding-cro, form-cro, popup-cro, paywall-upgrade-cro), copywriting, copy-editing, cold-email, email-sequence, social-content, seo-audit, ai-seo, programmatic-seo, site-architecture, schema-markup, content-strategy, paid-ads, ad-creative, ab-test-setup, analytics-tracking, referral-program, free-tool-strategy, churn-prevention, revops, sales-enablement, launch-strategy, pricing-strategy, competitor-alternatives, marketing-ideas, marketing-psychology, lead-magnets, product-marketing-context, and data connectors (google-ads-connect, search-console-connect, meta-ads-connect, x-twitter-connect). Start with product-marketing-context to set up your product context document, then use any other skill naturally. Powered by MyClaw.ai.★ 1k GitHub stars

More from rampstackco

SkillRun a comprehensive WCAG accessibility audit coveringrampstackco/claude-skills · by rampstackcoRun a comprehensive WCAG accessibility audit covering perceivable, operable, understandable, and robust principles. Use this skill whenever the user wants to audit accessibility, review WCAG compliance, fix accessibility issues, prepare for accessibility certification, address an accessibility lawsuit risk, or systematically improve a site's accessibility. Triggers on accessibility audit, WCAG audit, a11y audit, accessibility compliance, ADA compliance, screen reader test, keyboard navigation, accessibility report, fix accessibility, axe scan. Also triggers when accessibility issues have been reported and need systematic remediation.★ 901 GitHub starsSkillOptimize content and site structure for AI-driven searchAEO and GEOrampstackco/claude-skills · by rampstackcoOptimize content and site structure for AI-driven search experiences including AI overviews, large language model citations, generative answer engines, and AI assistants. Use this skill whenever the user wants to optimize for AI search, get cited by language models, appear in AI overviews, build llms.txt, structure content for AI extraction, or future-proof their SEO for the shift from blue links to AI answers. Triggers on AEO, GEO, AI search, AI SEO, AI overview, generative search, LLM optimization, llms.txt, AI citation, ChatGPT search, Perplexity, Gemini, Claude search, AI assistant optimization, answer engine. Also triggers when the user expresses concern about AI eating their organic traffic or wants to understand how to remain visible as search shifts.★ 901 GitHub starsSkillRun a structured after-action review on a launch, incidentAfter action reportrampstackco/claude-skills · by rampstackcoRun a structured after-action review (postmortem, retrospective) on a launch, incident, or completed project to capture timeline, root cause analysis, contributing factors, and actionable lessons. Use this skill whenever the user wants to run a postmortem, retrospective, AAR, or after-action review on any past event. Triggers on after-action report, AAR, postmortem, retrospective, retro, post-incident review, what went well what didn't, lessons learned, blameless postmortem, root cause analysis, RCA, five whys. Also triggers when the user has just shipped something or just resolved an incident and wants to capture learnings.★ 901 GitHub starsSkillDesign measurement frameworks including event taxonomyAnalytics strategyrampstackco/claude-skills · by rampstackcoDesign measurement frameworks including event taxonomy, KPI hierarchy, dashboard architecture, attribution models, and analytics implementation strategy. Use this skill whenever the user wants to plan analytics, design dashboards, build event taxonomies, define KPIs, set up tracking, or audit existing measurement. Triggers on analytics strategy, measurement plan, event taxonomy, tracking plan, KPI framework, dashboard design, north star metric, attribution model, conversion tracking, GA4 setup, Mixpanel setup, analytics audit. Also triggers when the user has data but no clear way to use it, or wants to make decisions but doesn't know what to track.★ 901 GitHub starsSkillDirect visual and creative work for campaigns, photographyArt directionrampstackco/claude-skills · by rampstackcoDirect visual and creative work for campaigns, photography, illustration, video, and branded experiences. Use this skill whenever the user wants to brief a photographer, direct illustrators, plan a creative campaign, develop visual concepts, or evaluate creative work for fit. Triggers on art direction, photo brief, photography brief, illustration brief, campaign concept, creative concept, visual direction, mood board, look and feel, visual treatment, video direction. Also triggers when the user has approved brand identity but needs to extend it into specific creative deliverables. Use `creative-direction` instead when the ask is the project-wide aesthetic brief that this skill consumes as input.★ 901 GitHub starsSkillPlan and run backups, set recovery objectivesBackup and disaster recoveryrampstackco/claude-skills · by rampstackcoPlan and run backups, set recovery objectives, and run disaster recovery drills. Use this skill when defining RPO/RTO targets, designing backup architecture, deciding what to back up and how often, planning for full-region or platform outages, or running a restoration drill. Triggers on backup, restore, RPO, RTO, disaster recovery, DR, business continuity, what if the database is gone, what if our hosting goes down, recovery drill, ransomware planning. Also triggers when an incident reveals a gap in restoration capability.★ 901 GitHub stars