Marketing Project Management skill

Marketing project management and execution excellence for B2B SaaS campaigns.

by shalintripathi·MIT license·★ 20 Stars on the repo·GitHub ↗

Use now

Inside this skill

SKILL.md · the author's own words
# Marketing Project Management

## Step 0 (always first): Load brand context

**Before producing any deliverable, look for a `brand-context.md` file** in the user's project root (also check `./.claude/brand-context.md…

- **If it exists:** read it in full and treat it as binding for this run. Hand its contents to every specialist agent you route work to, al…
- **If it does not exist:** say so, point the user at the template ([`templates/brand-context.md`](../../templates/brand-context.md)), and…

**Non-negotiable regardless of which path applies:** do not invent customer names, metrics, funding, integrations, certifications, or outco…

---

## What This Is

Marketing Project Management brings together campaign coordinators, client success managers, resource allocators, and agile marketing coach…

Word-for-word excerpt, not a result. Read the full SKILL.md ↓

Files of Marketing Project Management

shalintripathi/main1 file shown
SKILL.md
Show the full text376 lines

Marketing Project Management

Step 0 (always first): Load brand context

Before producing any deliverable, look for a brand-context.md file in the user's project root (also check ./.claude/brand-context.md and ./docs/brand-context.md). It holds the company's ICP, positioning, messaging pillars, citable proof, voice, banned words, and compliance constraints.

  • If it exists: read it in full and treat it as binding for this run. Hand its contents to every specialist agent you route work to, alongside the task brief. Its "Rules for agents reading this file" section overrides an agent's own defaults.
  • If it does not exist: say so, point the user at the template (templates/brand-context.md), and offer to generate a filled draft by interviewing them or by reading their website and existing content. Then proceed with explicitly-labelled assumptions — never silently invented ones.

Non-negotiable regardless of which path applies: do not invent customer names, metrics, funding, integrations, certifications, or outcomes. Only proof recorded in brand-context.md (or supplied directly in the request) may be used as fact. Where a claim would help but no evidence exists, emit a [NEEDS INPUT: …] marker in the deliverable rather than a plausible-sounding guess.


What This Is

Marketing Project Management brings together campaign coordinators, client success managers, resource allocators, and agile marketing coaches to execute campaigns with precision and keep teams focused on high-impact work. This skill orchestrates the operational side of marketing—breaking down campaign complexity into manageable tasks, allocating constrained resources efficiently, running agile marketing sprints with clear outcomes, managing client expectations and deliverables, and ensuring teams don't get bogged down in busywork. Whether you're coordinating a multi-channel product launch, running a quarterly business review with a customer, building a resource allocation plan, or implementing agile marketing practices, Marketing Project Management routes your request to the right specialist and ensures your team ships quality work on time.

The Team: 4 Specialist Agents

# Agent File What They Do
1 Campaign Coordinator agents/pm-campaign-coordinator.md Plans and executes campaign campaigns end-to-end, breaks down complexity into tasks, manages timelines and dependencies, and ensures quality deliverables on schedule
2 Resource Allocator agents/pm-resource-allocator.md Analyzes team capacity, prioritizes high-impact work, allocates resources fairly across competing demands, and identifies bottlenecks limiting throughput
3 Marketing Ops Scrum Master agents/pm-marketing-ops-scrum-master.md Coaches teams on agile marketing practices, runs sprint planning and retrospectives, removes blockers, and maintains sustainable pace
4 Client Success Manager agents/pm-client-success-manager.md Manages client relationships and expectations, ensures deliverable quality, runs QBRs with clients, and identifies expansion opportunities

How to Use

Routing User Requests

Campaign Planning & Execution → Campaign Coordinator

  • "Plan the go-to-market execution for our Q3 product launch"
  • "Build a project plan for a multi-channel demand generation campaign"
  • "Create a timeline and task breakdown for content creation campaign"
  • "Manage dependencies and coordinate across design, content, and promotion teams"

Team Capacity & Resource Allocation → Resource Allocator

  • "Build a resource allocation plan for next quarter"
  • "Analyze team capacity and identify bottlenecks limiting campaign throughput"
  • "Allocate designers, writers, and other resources across competing campaign demands"
  • "Identify which campaigns should be deprioritized given current team capacity"

Agile Marketing & Sprint Execution → Marketing Ops Scrum Master

  • "Implement agile marketing practices (sprints, daily standups, retrospectives)"
  • "Coach marketing team on sprint planning and estimation"
  • "Design sprint cadence and work planning for marketing department"
  • "Help team maintain sustainable pace without burnout"

Client Success & QBRs → Client Success Manager

  • "Manage our relationship with [customer], ensure deliverable quality and satisfaction"
  • "Prepare and run a quarterly business review (QBR) with key customer"
  • "Review customer success metrics and identify expansion opportunities"
  • "Handle escalations and ensure customer expectations are managed"
Execution Model

Campaign Execution (6-16 weeks depending on scope)

Phase 1: Campaign Planning (Week 1-2)

  • Campaign Coordinator works with marketing leadership to define campaign objectives, target audience, channels, timeline
  • Break down campaign into key workstreams (demand gen, content, creative, analytics)
  • For each workstream: identify deliverables, dependencies, resource requirements, timeline
  • Build detailed project plan with tasks, owners, due dates, dependencies
  • Get stakeholder alignment on timeline, dependencies, and resource requirements
  • Identify critical path (dependencies that constrain overall timeline)

Phase 2: Team Mobilization & Kick-Off (Week 2-3)

  • Resource Allocator confirms resource availability and allocates team members to campaign
  • Campaign Coordinator runs campaign kick-off: brief team on objectives, timeline, roles, how success is measured
  • Establish weekly cadence: status meetings, decision-making process, escalation path
  • Marketing Ops Scrum Master: if using agile, run sprint planning meeting to build sprint backlog
  • First deliverables assigned with clear due dates

Phase 3: Execution & Tracking (Week 3-14)

  • Campaign Coordinator: weekly status tracking, deadline management, dependency coordination
  • Weekly status meetings: report progress, identify blockers, adjust timeline as needed
  • Marketing Ops Scrum Master: daily standups (15 min), sprint reviews (if using sprints), remove blockers preventing progress
  • Resource Allocator: monitor team capacity, reallocate if bottlenecks emerge
  • Quality reviews: Campaign Coordinator ensures deliverable quality before shipping
  • Risk management: identify risks, adjust timeline/scope as needed

Phase 4: Launch & Measurement (Week 14-16)

  • Campaign Coordinator coordinates simultaneous launch across all channels
  • Ensures all tracking is properly implemented (UTM parameters, conversion pixels, event tracking)
  • Monitoring dashboard: setup real-time tracking of campaign performance
  • Daily monitoring: first week post-launch, check for technical issues, optimize based on early performance
  • Campaign Coordinator documents launch readiness checklist and sign-offs

Phase 5: Post-Campaign Analysis & Retrospective (Week 17)

  • Performance Analyst: performance review against KPIs and benchmarks
  • Campaign Coordinator: operational retrospective (what worked in execution, what we'd change next time)
  • Marketing Ops Scrum Master: team retrospective (how team performed, sustainable pace, learnings)
  • Document learnings and apply to next campaign
Resource Allocation Framework

Capacity Planning Process (Quarterly)

  1. Inventory team capacity by role

    • Designers: 40 hours/week available, estimate hours per deliverable (landing page 16 hrs, ad creative 8 hrs, infographic 12 hrs)
    • Writers/Content: 40 hours/week available, estimate hours per deliverable (blog post 12 hrs, email sequence 8 hrs, case study 20 hrs)
    • Project managers: 30% capacity for coordination/meetings
    • Marketing ops: 30% capacity for analytics/tracking/reporting
  2. Inventory competing demands

    • Campaigns in flight (ongoing demand gen, nurture, retention)
    • New campaigns launching next quarter (product launch, new audience, new channel)
    • Ongoing operational work (landing page maintenance, analytics reporting, tech updates)
    • Strategic/future work (positioning, new product evaluation, process improvements)
  3. Estimate effort required for each initiative

    • High effort: 100+ hours (product launch, major campaign redesign)
    • Medium effort: 40-100 hours (feature launch, content campaign)
    • Low effort: <40 hours (optimization, small refresh, one-off deliverable)
  4. Prioritize ruthlessly

    • Tier 1: must-do campaigns (product launch, board initiatives, enterprise customer needs)
    • Tier 2: should-do campaigns (optimizations, new channels, strategic initiatives)
    • Tier 3: nice-to-have (polish, innovation, exploration)
    • Only commit to Tier 1 + some Tier 2 (likely 60-70% of available capacity)
    • Hold 20-30% capacity buffer for urgent requests, blockers, revisions
  5. Allocate resources

    • Assign team members to Tier 1 campaigns (primary focus)
    • Assign team members to Tier 2 campaigns (secondary focus, lower priority)
    • Leave 20-30% unallocated for flexibility and unexpected demands
    • Document allocation: who is assigned to what, % of time, timeline
Agile Marketing Model

Sprint Structure (1-2 weeks)

  • Sprint planning (day 1, 1 hour): team reviews backlog, estimates effort, commits to sprint
  • Daily standup (10-15 min): what did I do yesterday, what am I doing today, any blockers
  • Sprint execution (days 2-9): team works on committed tasks, no new work added mid-sprint
  • Sprint review (day 10, 1 hour): demo completed work, celebrate wins, capture feedback
  • Sprint retrospective (day 10, 45 min): what went well, what could improve, commit to actions
  • Next sprint planning: planning kicks off for next sprint

Agile Metrics

  • Velocity: how many story points team completes per sprint (trend over time)
  • Burndown: visual tracking of work remaining vs. days remaining in sprint
  • Capacity planning: velocity × number of sprints per quarter = how much work team can commit to
  • Cycle time: average time from task creation to completion (indicates efficiency)
  • Blockers: number of blockers per sprint and how quickly they're resolved

Backlog Prioritization

  • Product backlog: full list of potential work (features, optimizations, fixes) prioritized by impact
  • Sprint backlog: work committed for current sprint
  • Prioritization criteria: business impact, customer impact, team velocity, dependencies
  • Backlog grooming: weekly review of backlog to ensure prioritization is current
Client Success & QBR Model

Client Relationship Tiers

  • Tier 1 (Enterprise/Strategic): monthly check-ins, quarterly QBRs, dedicated account manager
  • Tier 2 (Mid-Market): quarterly business reviews, group check-ins, assigned project manager
  • Tier 3 (SMB): annual review, group events, email support, self-service resources

QBR Preparation (4 weeks before)

  • Client Success Manager: schedule QBR, confirm attendees, set agenda
  • Gather deliverables completed last quarter: projects shipped, campaigns executed, results delivered
  • Gather performance metrics: pipeline generated, ROI delivered, quality of leads/results
  • Client Success Manager: identify expansion opportunities: what's working well that we could expand, what new services would help client
  • Build presentation: narrative arc of success, metrics achieved, client testimonials, ROI delivered, next quarter roadmap
  • Prep executive sponsor: brief company executive on client relationship, key metrics, expansion opportunity

QBR Execution (60 min meeting)

  • Open (5 min): relationship appreciation, confirm agenda, desired outcomes
  • Previous quarter review (15 min): deliverables shipped, metrics achieved, client feedback
  • Analysis/insights (15 min): data storytelling on what's working, what changed, competitive positioning
  • Expansion discussion (15 min): what's working well that we could expand, new services aligned with client goals
  • Next quarter plan (10 min): roadmap for next quarter, resource allocation, investment level
  • Close (5 min): confirm next steps, expansion decision, schedule next check-in

Client Success Metrics

  • NPS (Net Promoter Score): customer satisfaction survey (9-10 promoters, 7-8 passives, 0-6 detractors)
  • Retention rate: percentage of customers retained year-over-year
  • Expansion rate: percentage of customers expanding services or budget
  • Time to value: how quickly customer achieves ROI or first business outcome
  • CSAT (Customer Satisfaction): satisfaction with deliverables and outcomes
  • Effort score: how easy is it to work with our team and get support
Routing by Work Type

Multi-Channel Campaign (3-6 month timeline)

  • Campaign Coordinator leads planning and execution
  • Resource Allocator allocates designers, writers, strategists, analysts
  • Marketing Ops Scrum Master runs agile sprints if using sprint model
  • Campaign Coordinator coordinates weekly status, manages dependencies, ensures quality
  • Success metrics: campaign ships on time/budget, all deliverables meet quality standards, campaign achieves performance goals

Ongoing Demand Generation (monthly cadence)

  • Campaign Coordinator: monthly planning, prioritization of campaigns
  • Resource Allocator: sustainable resource allocation preventing team burnout
  • Marketing Ops Scrum Master: sprint cadence with predictable rhythm (e.g., 2-week sprints)
  • Weekly execution with daily standups
  • Success metrics: consistent monthly pipeline generation, high team morale/retention, predictable delivery

Strategic Initiative/Transformation (6-12 month timeline)

  • Marketing Ops Scrum Master: organize large program into manageable phases and sprints
  • Campaign Coordinator: coordinate dependencies across multiple teams
  • Resource Allocator: manage resource constraints, ensure sufficient capacity allocated
  • Quarterly reviews: assess progress, adjust timeline/scope as needed
  • Success metrics: program ships on schedule, business goals achieved, team maintains sustainable pace

Enterprise Client Engagement (ongoing)

  • Client Success Manager: primary relationship owner, quarterly QBRs
  • Campaign Coordinator: execution of agreed deliverables, maintains timeline
  • Resource Allocator: ensures resources allocated to client campaigns
  • Monthly check-ins on progress, quarterly business reviews, annual relationship reviews
  • Success metrics: 95%+ client retention, high expansion rate, strong NPS, customer testimonials

Output Standards

Project Plan Quality Checklist

Completeness

  • All deliverables clearly defined: what is being created, format, success criteria
  • Task breakdown: deliverables broken into ~5-40 hour tasks (manageable chunks)
  • Owners assigned: every task has clear owner and due date
  • Dependencies mapped: what tasks depend on completion of prior tasks
  • Timeline realistic: accounts for discovery, design, review cycles, buffer for rework

Clarity

  • Objectives clear: why this project matters, success criteria defined
  • Assumptions documented: what must be true for timeline to work (budget approved, team fully allocated, no changes to scope)
  • Risks identified: what could go wrong, mitigation plan
  • Communication plan: how team stays informed (daily standup, weekly status, monthly reviews)
  • Escalation path: who to escalate to if timeline/quality at risk

Stakeholder Alignment

  • Key stakeholders identified: who approves, who is impacted, who needs to be informed
  • Feedback loops: when do stakeholders review/approve (discovery review, design review, final review)
  • Change control: how out-of-scope changes are handled and approved
  • Success metrics: how success is measured and communicated
Deliverable Specifications

Project Plan Document

  • Executive overview: project objectives, timeline, key dependencies, resource requirements
  • Timeline: high-level Gantt chart showing phases, milestones, critical path
  • Workstream breakdown: by workstream (design, content, analytics), deliverables, owner, timeline, dependencies
  • Task breakdown: detailed task list with owner, due date, dependency, effort estimate
  • Resource plan: team allocated, roles, capacity %, timeline
  • Risk plan: identified risks, impact, mitigation strategy
  • Communication plan: status cadence, stakeholders, reporting format
  • Quality plan: quality review process, approval gates, success criteria

Resource Allocation Plan

  • Team capacity inventory: by role (designers, writers, strategists, analysts), available hours per week
  • Demand inventory: all campaigns/projects, effort required, timeline
  • Allocation table: team member, role, project assignments, % allocated, timeline
  • Capacity utilization: total allocated % by role (target 70-80%, leave 20-30% buffer)
  • Risk assessment: bottlenecks, resource constraints, contingency plans
  • Quarterly plan: allocation by quarter, how to flex for peaks/troughs

Sprint Plan

  • Sprint goal: what are we trying to accomplish this sprint (1-2 sentences)
  • Sprint backlog: list of user stories/tasks, estimated effort, assigned to team member
  • Sprint capacity: total capacity available (e.g., 80 story points), total committed
  • Dependency map: what blocks what, external dependencies
  • Acceptance criteria: definition of done for each story
  • Risk: potential blockers or challenges for sprint

Campaign Kickoff Deck

  • Campaign overview: objectives, target audience, timeline, budget, success metrics
  • Roles & responsibilities: team members, roles, decision makers, escalation path
  • Timeline: key milestones, deliverable due dates, approval gates
  • Channels & tactics: what we're doing, by channel/tactic, timeline
  • Creative strategy: messaging, customer proof, creative direction
  • Measurement: how success is measured, KPIs, reporting cadence
  • Weekly cadence: status meetings, decision-making process, communication

Client QBR Presentation

  • Executive summary: relationship status, key achievements, outcomes
  • Previous quarter review: deliverables, performance vs. KPIs, customer feedback
  • Customer success story: specific wins, customer ROI, testimonial
  • Analysis & insights: what's working, competitive landscape, market trends
  • Expansion opportunity: what's next, how to expand, investment required
  • Next quarter plan: timeline, deliverables, investment, expected outcomes
  • Appendix: detailed metrics, case studies, supporting data
Quality Review Process

Before launching any project or campaign:

  1. Completeness Check: Are all deliverables defined? Are all tasks assigned and dated? Are dependencies clear?
  2. Realistic Timeline: Is timeline achievable given team capacity and complexity? Are there buffers for discovery/review?
  3. Stakeholder Alignment: Do stakeholders understand timeline, dependencies, and their role in approvals?
  4. Risk Assessment: What could go wrong? Do we have mitigation plans?
  5. Resource Verification: Do we have committed team capacity? Do team members agree to assignments?
  6. Success Criteria: Is success clearly defined and measurable? Will we know if we achieved it?
Success Metrics by Program Type

Campaign Execution

  • On-time delivery: 90%+ of deliverables delivered by due date
  • Budget management: actual costs within 10% of budget estimate
  • Quality score: 95%+ of deliverables pass quality review on first submission
  • Scope control: 90%+ of campaigns shipped with minimal out-of-scope work
  • Team satisfaction: team reports manageable workload and sustainable pace

Resource Allocation

  • Capacity utilization: 70-80% allocated, 20-30% buffer for flexibility
  • Bottleneck reduction: eliminate resource bottlenecks limiting campaign throughput
  • Team retention: high retention rate, low burnout indicators
  • Allocation accuracy: actual allocation vs. planned allocation within 10%
  • Prioritization adherence: 90%+ of work completed is from prioritized backlog

Sprint Execution (if using Agile)

  • Velocity consistency: sprint velocity stable (±10%) quarter-over-quarter
  • Commitment achievement: 85%+ of sprint commitments completed
  • Cycle time: average task completion time <5 days
  • Blocker resolution: blockers resolved within 1 day
  • Team sustainability: team maintains velocity without burnout

Client Success

  • Retention rate: 95%+ customer retention year-over-year
  • Expansion rate: 30%+ of customers expand services or budget
  • NPS score: 60+ (9-10 promoters minus 0-6 detractors)
  • CSAT score: 4.0+ out of 5.0 on deliverables satisfaction
  • Time to value: customer achieves ROI within 90 days of engagement start

Tools & Systems

Project Management Tools

  • Task management (Asana, Monday.com, Linear for task tracking and timeline)
  • Gantt charting (MS Project, Smartsheet for complex timeline visualization)
  • Collaboration (Notion, Confluence for documentation and knowledge sharing)
  • Time tracking (Toggl, Harvest for actual vs. estimated effort)

Agile Coaching Tools

  • Sprint planning (Jira, Azure DevOps for sprint backlog and velocity tracking)
  • Standup tools (Slack integrations for daily standup automation)
  • Retrospective templates (digital whiteboards like Miro for remote retrospectives)
  • Velocity tracking (burndown charts, velocity trends)

Resource Management

  • Capacity planning (spreadsheet model or dedicated platform like Kimble)
  • Workload visualization (Asana's portfolio view, team calendar views)
  • Skills matrix (who has what skills, capacity by skill)
  • Utilization reporting (are we allocated efficiently)

Client Management

  • CRM integration (Salesforce for client relationship tracking)
  • QBR toolkit (presentation templates, success metrics templates)
  • Client portal (shared workspace for deliverables, feedback, communication)
  • NPS/CSAT surveys (SurveyMonkey, Typeform for client satisfaction tracking)

Team Health & Sustainability

Sustainable Pace Indicators

  • Weekly hours: target 40-45 hours/week (avoid chronic 50+ hour weeks)
  • Overtime: <10% of team in overtime any given week
  • Vacation usage: 90%+ of team takes full vacation allocation
  • Burnout indicators: monitor stress levels, retention, engagement scores
  • Delivery quality: maintain quality standards without cutting corners

Capacity Planning Guardrails

  • Never overallocate: cap allocation at 80%, keep 20% buffer for unexpected work
  • Prioritize ruthlessly: use prioritization framework to say no to lower-priority work
  • Scope control: freeze scope mid-project to prevent timeline creep
  • Buffer time: build 15-20% schedule buffer into project timelines
  • Team rotation: rotate team members across projects to prevent bottlenecks

Communication Standards

  • Status cadence: weekly status meetings (15 min), monthly reviews with leadership
  • Transparency: share blockers and risks early, don't hide problems
  • Decision-making: clear process for approvals, who decides, timeline for decisions
  • Escalation: clear escalation path for blockers, risks, scope changes
  • Learning: retrospectives after each major project/sprint to capture learnings
1---
2name: marketing-project-mgmt
3description: "Marketing project management and execution excellence for B2B SaaS campaigns. Use this skill when coordinating multi-channel campaigns, allocating team resources, planning agile marketing sprints, running QBRs with clients, managing project timelines, balancing marketing workload, or implementing marketing operations scrum. Also triggers on: campaign coordination, resource allocation, agile marketing, sprint planning, client success, QBR, project timeline, marketing ops scrum, workload balancing."
4---
5 
6# Marketing Project Management
7 
8## Step 0 (always first): Load brand context
9 
10**Before producing any deliverable, look for a `brand-context.md` file** in the user's project root (also check `./.claude/brand-context.md` and `./docs/brand-context.md`). It holds the company's ICP, positioning, messaging pillars, citable proof, voice, banned words, and compliance constraints.
11 
12- **If it exists:** read it in full and treat it as binding for this run. Hand its contents to every specialist agent you route work to, alongside the task brief. Its "Rules for agents reading this file" section overrides an agent's own defaults.
13- **If it does not exist:** say so, point the user at the template ([`templates/brand-context.md`](../../templates/brand-context.md)), and offer to generate a filled draft by interviewing them or by reading their website and existing content. Then proceed with explicitly-labelled assumptions — never silently invented ones.
14 
15**Non-negotiable regardless of which path applies:** do not invent customer names, metrics, funding, integrations, certifications, or outcomes. Only proof recorded in `brand-context.md` (or supplied directly in the request) may be used as fact. Where a claim would help but no evidence exists, emit a `[NEEDS INPUT: …]` marker in the deliverable rather than a plausible-sounding guess.
16 
17---
18 
19## What This Is
20 
21Marketing Project Management brings together campaign coordinators, client success managers, resource allocators, and agile marketing coaches to execute campaigns with precision and keep teams focused on high-impact work. This skill orchestrates the operational side of marketing—breaking down campaign complexity into manageable tasks, allocating constrained resources efficiently, running agile marketing sprints with clear outcomes, managing client expectations and deliverables, and ensuring teams don't get bogged down in busywork. Whether you're coordinating a multi-channel product launch, running a quarterly business review with a customer, building a resource allocation plan, or implementing agile marketing practices, Marketing Project Management routes your request to the right specialist and ensures your team ships quality work on time.
22 
23## The Team: 4 Specialist Agents
24 
25| # | Agent | File | What They Do |
26|---|-------|------|-------------|
27| 1 | Campaign Coordinator | `agents/pm-campaign-coordinator.md` | Plans and executes campaign campaigns end-to-end, breaks down complexity into tasks, manages timelines and dependencies, and ensures quality deliverables on schedule |
28| 2 | Resource Allocator | `agents/pm-resource-allocator.md` | Analyzes team capacity, prioritizes high-impact work, allocates resources fairly across competing demands, and identifies bottlenecks limiting throughput |
29| 3 | Marketing Ops Scrum Master | `agents/pm-marketing-ops-scrum-master.md` | Coaches teams on agile marketing practices, runs sprint planning and retrospectives, removes blockers, and maintains sustainable pace |
30| 4 | Client Success Manager | `agents/pm-client-success-manager.md` | Manages client relationships and expectations, ensures deliverable quality, runs QBRs with clients, and identifies expansion opportunities |
31 
32## How to Use
33 
34### Routing User Requests
35 
36**Campaign Planning & Execution** → Campaign Coordinator
37- "Plan the go-to-market execution for our Q3 product launch"
38- "Build a project plan for a multi-channel demand generation campaign"
39- "Create a timeline and task breakdown for content creation campaign"
40- "Manage dependencies and coordinate across design, content, and promotion teams"
41 
42**Team Capacity & Resource Allocation** → Resource Allocator
43- "Build a resource allocation plan for next quarter"
44- "Analyze team capacity and identify bottlenecks limiting campaign throughput"
45- "Allocate designers, writers, and other resources across competing campaign demands"
46- "Identify which campaigns should be deprioritized given current team capacity"
47 
48**Agile Marketing & Sprint Execution** → Marketing Ops Scrum Master
49- "Implement agile marketing practices (sprints, daily standups, retrospectives)"
50- "Coach marketing team on sprint planning and estimation"
51- "Design sprint cadence and work planning for marketing department"
52- "Help team maintain sustainable pace without burnout"
53 
54**Client Success & QBRs** → Client Success Manager
55- "Manage our relationship with [customer], ensure deliverable quality and satisfaction"
56- "Prepare and run a quarterly business review (QBR) with key customer"
57- "Review customer success metrics and identify expansion opportunities"
58- "Handle escalations and ensure customer expectations are managed"
59 
60### Execution Model
61 
62**Campaign Execution (6-16 weeks depending on scope)**
63 
64Phase 1: Campaign Planning (Week 1-2)
65- Campaign Coordinator works with marketing leadership to define campaign objectives, target audience, channels, timeline
66- Break down campaign into key workstreams (demand gen, content, creative, analytics)
67- For each workstream: identify deliverables, dependencies, resource requirements, timeline
68- Build detailed project plan with tasks, owners, due dates, dependencies
69- Get stakeholder alignment on timeline, dependencies, and resource requirements
70- Identify critical path (dependencies that constrain overall timeline)
71 
72Phase 2: Team Mobilization & Kick-Off (Week 2-3)
73- Resource Allocator confirms resource availability and allocates team members to campaign
74- Campaign Coordinator runs campaign kick-off: brief team on objectives, timeline, roles, how success is measured
75- Establish weekly cadence: status meetings, decision-making process, escalation path
76- Marketing Ops Scrum Master: if using agile, run sprint planning meeting to build sprint backlog
77- First deliverables assigned with clear due dates
78 
79Phase 3: Execution & Tracking (Week 3-14)
80- Campaign Coordinator: weekly status tracking, deadline management, dependency coordination
81- Weekly status meetings: report progress, identify blockers, adjust timeline as needed
82- Marketing Ops Scrum Master: daily standups (15 min), sprint reviews (if using sprints), remove blockers preventing progress
83- Resource Allocator: monitor team capacity, reallocate if bottlenecks emerge
84- Quality reviews: Campaign Coordinator ensures deliverable quality before shipping
85- Risk management: identify risks, adjust timeline/scope as needed
86 
87Phase 4: Launch & Measurement (Week 14-16)
88- Campaign Coordinator coordinates simultaneous launch across all channels
89- Ensures all tracking is properly implemented (UTM parameters, conversion pixels, event tracking)
90- Monitoring dashboard: setup real-time tracking of campaign performance
91- Daily monitoring: first week post-launch, check for technical issues, optimize based on early performance
92- Campaign Coordinator documents launch readiness checklist and sign-offs
93 
94Phase 5: Post-Campaign Analysis & Retrospective (Week 17)
95- Performance Analyst: performance review against KPIs and benchmarks
96- Campaign Coordinator: operational retrospective (what worked in execution, what we'd change next time)
97- Marketing Ops Scrum Master: team retrospective (how team performed, sustainable pace, learnings)
98- Document learnings and apply to next campaign
99 
100### Resource Allocation Framework
101 
102**Capacity Planning Process (Quarterly)**
1031. Inventory team capacity by role
104 - Designers: 40 hours/week available, estimate hours per deliverable (landing page 16 hrs, ad creative 8 hrs, infographic 12 hrs)
105 - Writers/Content: 40 hours/week available, estimate hours per deliverable (blog post 12 hrs, email sequence 8 hrs, case study 20 hrs)
106 - Project managers: 30% capacity for coordination/meetings
107 - Marketing ops: 30% capacity for analytics/tracking/reporting
108 
1092. Inventory competing demands
110 - Campaigns in flight (ongoing demand gen, nurture, retention)
111 - New campaigns launching next quarter (product launch, new audience, new channel)
112 - Ongoing operational work (landing page maintenance, analytics reporting, tech updates)
113 - Strategic/future work (positioning, new product evaluation, process improvements)
114 
1153. Estimate effort required for each initiative
116 - High effort: 100+ hours (product launch, major campaign redesign)
117 - Medium effort: 40-100 hours (feature launch, content campaign)
118 - Low effort: <40 hours (optimization, small refresh, one-off deliverable)
119 
1204. Prioritize ruthlessly
121 - Tier 1: must-do campaigns (product launch, board initiatives, enterprise customer needs)
122 - Tier 2: should-do campaigns (optimizations, new channels, strategic initiatives)
123 - Tier 3: nice-to-have (polish, innovation, exploration)
124 - Only commit to Tier 1 + some Tier 2 (likely 60-70% of available capacity)
125 - Hold 20-30% capacity buffer for urgent requests, blockers, revisions
126 
1275. Allocate resources
128 - Assign team members to Tier 1 campaigns (primary focus)
129 - Assign team members to Tier 2 campaigns (secondary focus, lower priority)
130 - Leave 20-30% unallocated for flexibility and unexpected demands
131 - Document allocation: who is assigned to what, % of time, timeline
132 
133### Agile Marketing Model
134 
135**Sprint Structure (1-2 weeks)**
136- Sprint planning (day 1, 1 hour): team reviews backlog, estimates effort, commits to sprint
137- Daily standup (10-15 min): what did I do yesterday, what am I doing today, any blockers
138- Sprint execution (days 2-9): team works on committed tasks, no new work added mid-sprint
139- Sprint review (day 10, 1 hour): demo completed work, celebrate wins, capture feedback
140- Sprint retrospective (day 10, 45 min): what went well, what could improve, commit to actions
141- Next sprint planning: planning kicks off for next sprint
142 
143**Agile Metrics**
144- Velocity: how many story points team completes per sprint (trend over time)
145- Burndown: visual tracking of work remaining vs. days remaining in sprint
146- Capacity planning: velocity × number of sprints per quarter = how much work team can commit to
147- Cycle time: average time from task creation to completion (indicates efficiency)
148- Blockers: number of blockers per sprint and how quickly they're resolved
149 
150**Backlog Prioritization**
151- Product backlog: full list of potential work (features, optimizations, fixes) prioritized by impact
152- Sprint backlog: work committed for current sprint
153- Prioritization criteria: business impact, customer impact, team velocity, dependencies
154- Backlog grooming: weekly review of backlog to ensure prioritization is current
155 
156### Client Success & QBR Model
157 
158**Client Relationship Tiers**
159- Tier 1 (Enterprise/Strategic): monthly check-ins, quarterly QBRs, dedicated account manager
160- Tier 2 (Mid-Market): quarterly business reviews, group check-ins, assigned project manager
161- Tier 3 (SMB): annual review, group events, email support, self-service resources
162 
163**QBR Preparation (4 weeks before)**
164- Client Success Manager: schedule QBR, confirm attendees, set agenda
165- Gather deliverables completed last quarter: projects shipped, campaigns executed, results delivered
166- Gather performance metrics: pipeline generated, ROI delivered, quality of leads/results
167- Client Success Manager: identify expansion opportunities: what's working well that we could expand, what new services would help client
168- Build presentation: narrative arc of success, metrics achieved, client testimonials, ROI delivered, next quarter roadmap
169- Prep executive sponsor: brief company executive on client relationship, key metrics, expansion opportunity
170 
171**QBR Execution (60 min meeting)**
172- Open (5 min): relationship appreciation, confirm agenda, desired outcomes
173- Previous quarter review (15 min): deliverables shipped, metrics achieved, client feedback
174- Analysis/insights (15 min): data storytelling on what's working, what changed, competitive positioning
175- Expansion discussion (15 min): what's working well that we could expand, new services aligned with client goals
176- Next quarter plan (10 min): roadmap for next quarter, resource allocation, investment level
177- Close (5 min): confirm next steps, expansion decision, schedule next check-in
178 
179**Client Success Metrics**
180- NPS (Net Promoter Score): customer satisfaction survey (9-10 promoters, 7-8 passives, 0-6 detractors)
181- Retention rate: percentage of customers retained year-over-year
182- Expansion rate: percentage of customers expanding services or budget
183- Time to value: how quickly customer achieves ROI or first business outcome
184- CSAT (Customer Satisfaction): satisfaction with deliverables and outcomes
185- Effort score: how easy is it to work with our team and get support
186 
187### Routing by Work Type
188 
189**Multi-Channel Campaign (3-6 month timeline)**
190- Campaign Coordinator leads planning and execution
191- Resource Allocator allocates designers, writers, strategists, analysts
192- Marketing Ops Scrum Master runs agile sprints if using sprint model
193- Campaign Coordinator coordinates weekly status, manages dependencies, ensures quality
194- Success metrics: campaign ships on time/budget, all deliverables meet quality standards, campaign achieves performance goals
195 
196**Ongoing Demand Generation (monthly cadence)**
197- Campaign Coordinator: monthly planning, prioritization of campaigns
198- Resource Allocator: sustainable resource allocation preventing team burnout
199- Marketing Ops Scrum Master: sprint cadence with predictable rhythm (e.g., 2-week sprints)
200- Weekly execution with daily standups
201- Success metrics: consistent monthly pipeline generation, high team morale/retention, predictable delivery
202 
203**Strategic Initiative/Transformation (6-12 month timeline)**
204- Marketing Ops Scrum Master: organize large program into manageable phases and sprints
205- Campaign Coordinator: coordinate dependencies across multiple teams
206- Resource Allocator: manage resource constraints, ensure sufficient capacity allocated
207- Quarterly reviews: assess progress, adjust timeline/scope as needed
208- Success metrics: program ships on schedule, business goals achieved, team maintains sustainable pace
209 
210**Enterprise Client Engagement (ongoing)**
211- Client Success Manager: primary relationship owner, quarterly QBRs
212- Campaign Coordinator: execution of agreed deliverables, maintains timeline
213- Resource Allocator: ensures resources allocated to client campaigns
214- Monthly check-ins on progress, quarterly business reviews, annual relationship reviews
215- Success metrics: 95%+ client retention, high expansion rate, strong NPS, customer testimonials
216 
217## Output Standards
218 
219### Project Plan Quality Checklist
220 
221**Completeness**
222- All deliverables clearly defined: what is being created, format, success criteria
223- Task breakdown: deliverables broken into ~5-40 hour tasks (manageable chunks)
224- Owners assigned: every task has clear owner and due date
225- Dependencies mapped: what tasks depend on completion of prior tasks
226- Timeline realistic: accounts for discovery, design, review cycles, buffer for rework
227 
228**Clarity**
229- Objectives clear: why this project matters, success criteria defined
230- Assumptions documented: what must be true for timeline to work (budget approved, team fully allocated, no changes to scope)
231- Risks identified: what could go wrong, mitigation plan
232- Communication plan: how team stays informed (daily standup, weekly status, monthly reviews)
233- Escalation path: who to escalate to if timeline/quality at risk
234 
235**Stakeholder Alignment**
236- Key stakeholders identified: who approves, who is impacted, who needs to be informed
237- Feedback loops: when do stakeholders review/approve (discovery review, design review, final review)
238- Change control: how out-of-scope changes are handled and approved
239- Success metrics: how success is measured and communicated
240 
241### Deliverable Specifications
242 
243**Project Plan Document**
244- Executive overview: project objectives, timeline, key dependencies, resource requirements
245- Timeline: high-level Gantt chart showing phases, milestones, critical path
246- Workstream breakdown: by workstream (design, content, analytics), deliverables, owner, timeline, dependencies
247- Task breakdown: detailed task list with owner, due date, dependency, effort estimate
248- Resource plan: team allocated, roles, capacity %, timeline
249- Risk plan: identified risks, impact, mitigation strategy
250- Communication plan: status cadence, stakeholders, reporting format
251- Quality plan: quality review process, approval gates, success criteria
252 
253**Resource Allocation Plan**
254- Team capacity inventory: by role (designers, writers, strategists, analysts), available hours per week
255- Demand inventory: all campaigns/projects, effort required, timeline
256- Allocation table: team member, role, project assignments, % allocated, timeline
257- Capacity utilization: total allocated % by role (target 70-80%, leave 20-30% buffer)
258- Risk assessment: bottlenecks, resource constraints, contingency plans
259- Quarterly plan: allocation by quarter, how to flex for peaks/troughs
260 
261**Sprint Plan**
262- Sprint goal: what are we trying to accomplish this sprint (1-2 sentences)
263- Sprint backlog: list of user stories/tasks, estimated effort, assigned to team member
264- Sprint capacity: total capacity available (e.g., 80 story points), total committed
265- Dependency map: what blocks what, external dependencies
266- Acceptance criteria: definition of done for each story
267- Risk: potential blockers or challenges for sprint
268 
269**Campaign Kickoff Deck**
270- Campaign overview: objectives, target audience, timeline, budget, success metrics
271- Roles & responsibilities: team members, roles, decision makers, escalation path
272- Timeline: key milestones, deliverable due dates, approval gates
273- Channels & tactics: what we're doing, by channel/tactic, timeline
274- Creative strategy: messaging, customer proof, creative direction
275- Measurement: how success is measured, KPIs, reporting cadence
276- Weekly cadence: status meetings, decision-making process, communication
277 
278**Client QBR Presentation**
279- Executive summary: relationship status, key achievements, outcomes
280- Previous quarter review: deliverables, performance vs. KPIs, customer feedback
281- Customer success story: specific wins, customer ROI, testimonial
282- Analysis & insights: what's working, competitive landscape, market trends
283- Expansion opportunity: what's next, how to expand, investment required
284- Next quarter plan: timeline, deliverables, investment, expected outcomes
285- Appendix: detailed metrics, case studies, supporting data
286 
287### Quality Review Process
288 
289Before launching any project or campaign:
290 
2911. **Completeness Check**: Are all deliverables defined? Are all tasks assigned and dated? Are dependencies clear?
2922. **Realistic Timeline**: Is timeline achievable given team capacity and complexity? Are there buffers for discovery/review?
2933. **Stakeholder Alignment**: Do stakeholders understand timeline, dependencies, and their role in approvals?
2944. **Risk Assessment**: What could go wrong? Do we have mitigation plans?
2955. **Resource Verification**: Do we have committed team capacity? Do team members agree to assignments?
2966. **Success Criteria**: Is success clearly defined and measurable? Will we know if we achieved it?
297 
298### Success Metrics by Program Type
299 
300**Campaign Execution**
301- On-time delivery: 90%+ of deliverables delivered by due date
302- Budget management: actual costs within 10% of budget estimate
303- Quality score: 95%+ of deliverables pass quality review on first submission
304- Scope control: 90%+ of campaigns shipped with minimal out-of-scope work
305- Team satisfaction: team reports manageable workload and sustainable pace
306 
307**Resource Allocation**
308- Capacity utilization: 70-80% allocated, 20-30% buffer for flexibility
309- Bottleneck reduction: eliminate resource bottlenecks limiting campaign throughput
310- Team retention: high retention rate, low burnout indicators
311- Allocation accuracy: actual allocation vs. planned allocation within 10%
312- Prioritization adherence: 90%+ of work completed is from prioritized backlog
313 
314**Sprint Execution (if using Agile)**
315- Velocity consistency: sprint velocity stable (±10%) quarter-over-quarter
316- Commitment achievement: 85%+ of sprint commitments completed
317- Cycle time: average task completion time <5 days
318- Blocker resolution: blockers resolved within 1 day
319- Team sustainability: team maintains velocity without burnout
320 
321**Client Success**
322- Retention rate: 95%+ customer retention year-over-year
323- Expansion rate: 30%+ of customers expand services or budget
324- NPS score: 60+ (9-10 promoters minus 0-6 detractors)
325- CSAT score: 4.0+ out of 5.0 on deliverables satisfaction
326- Time to value: customer achieves ROI within 90 days of engagement start
327 
328## Tools & Systems
329 
330**Project Management Tools**
331- Task management (Asana, Monday.com, Linear for task tracking and timeline)
332- Gantt charting (MS Project, Smartsheet for complex timeline visualization)
333- Collaboration (Notion, Confluence for documentation and knowledge sharing)
334- Time tracking (Toggl, Harvest for actual vs. estimated effort)
335 
336**Agile Coaching Tools**
337- Sprint planning (Jira, Azure DevOps for sprint backlog and velocity tracking)
338- Standup tools (Slack integrations for daily standup automation)
339- Retrospective templates (digital whiteboards like Miro for remote retrospectives)
340- Velocity tracking (burndown charts, velocity trends)
341 
342**Resource Management**
343- Capacity planning (spreadsheet model or dedicated platform like Kimble)
344- Workload visualization (Asana's portfolio view, team calendar views)
345- Skills matrix (who has what skills, capacity by skill)
346- Utilization reporting (are we allocated efficiently)
347 
348**Client Management**
349- CRM integration (Salesforce for client relationship tracking)
350- QBR toolkit (presentation templates, success metrics templates)
351- Client portal (shared workspace for deliverables, feedback, communication)
352- NPS/CSAT surveys (SurveyMonkey, Typeform for client satisfaction tracking)
353 
354## Team Health & Sustainability
355 
356**Sustainable Pace Indicators**
357- Weekly hours: target 40-45 hours/week (avoid chronic 50+ hour weeks)
358- Overtime: <10% of team in overtime any given week
359- Vacation usage: 90%+ of team takes full vacation allocation
360- Burnout indicators: monitor stress levels, retention, engagement scores
361- Delivery quality: maintain quality standards without cutting corners
362 
363**Capacity Planning Guardrails**
364- Never overallocate: cap allocation at 80%, keep 20% buffer for unexpected work
365- Prioritize ruthlessly: use prioritization framework to say no to lower-priority work
366- Scope control: freeze scope mid-project to prevent timeline creep
367- Buffer time: build 15-20% schedule buffer into project timelines
368- Team rotation: rotate team members across projects to prevent bottlenecks
369 
370**Communication Standards**
371- Status cadence: weekly status meetings (15 min), monthly reviews with leadership
372- Transparency: share blockers and risks early, don't hide problems
373- Decision-making: clear process for approvals, who decides, timeline for decisions
374- Escalation: clear escalation path for blockers, risks, scope changes
375- Learning: retrospectives after each major project/sprint to capture learnings
376 

Discussion

Alternatives

Daily meeting updateInteractive daily standup/meeting update generator. Use when user says 'daily', 'standup', 'scrum update', 'status update', 'what did I do yesterday', 'prepare for meeting', 'morning update', or 'team sync'. Pulls activity from GitHub, Jira, and Claude Code session history. Conducts 4-question interview (yesterday, today, blockers, discussion topics) and generates formatted Markdown update.Business & ops · MITCs project managerProject Manager agent for sprint planning, Jira/Confluence workflows, Scrum ceremonies, and stakeholder reporting. Orchestrates project-management skills. Use when running delivery operations — e.g., planning a sprint with capacity and carry-over math in Jira, or assembling a portfolio health report for stakeholders from ticket and velocity data.Business & ops · MITProject Management — Domain Orchestrator & Delivery LoopUse when coordinating project-delivery work across the 8 project-management sub-skills — sprint/velocity analytics, portfolio health, Jira/JQL, Confluence, Atlassian admin, templates, meeting analysis, team comms. Triggers on 'our sprints feel off', 'project health report', 'audit our Jira permissions', 'when will it be done', 'run the delivery loop'. Forks context to route to one sub-skill via a deterministic signal router and returns a digest; can also drive a full goal→plan→execute→verify→close delivery loop through the repo-wide agent-harness with Jira MCP data bridged into the domain's analytics tools. Distinct from product-team (what to build vs how to deliver it), business-operations (internal ops), and engineering/agent-harness (the generic loop engine this orchestrator plugs into). · MITSenior Project Management ExpertSenior Project Manager for enterprise software, SaaS, and digital transformation projects. Specializes in portfolio management, quantitative risk analysis, resource optimization, stakeholder alignment, and executive reporting. Uses advanced methodologies including EMV analysis, Monte Carlo simulation, WSJF prioritization, and multi-dimensional health scoring. Use when a user needs help with project plans, project status reports, risk assessments, resource allocation, project roadmaps, milestone tracking, team capacity planning, portfolio health reviews, program management, or executive-level project reporting — especially for enterprise-scale initiatives with multiple workstreams, complex dependencies, or multi-million dollar budgets. · MIT