/digital-marketing-pro:growth-plan — Part 8 Flagship Deliverable skill

Produce the Part 8 Growth Plan: one strategy with scenario forecasts and a 30/60/90.

by indranilbanerjee·MIT license·★ 866 Stars on the repo·GitHub ↗

Use now

Inside this skill

SKILL.md · the author's own words
# /digital-marketing-pro:growth-plan — Part 8 Flagship Deliverable

The Growth Plan is the flagship client-facing deliverable. It synthesises every internal document produced in Parts 1–7 into a single 11-se…

## Context efficiency

Heavy skill. **Grep before Read** any referenced file, then `Read` only matched ranges with `offset` + `limit`. List the brand's data dir (…

**Specification:** [growth-plan-template.md](../context-engine/growth-plan-template.md) — the canonical 11-section structure.

## Pre-conditions

Before producing the Growth Plan, verify:

1. **Parts 1–7 completed** in the engagement
2. **Four Core Documents at canonical version** (v2 if re-runs happened, v1 otherwise)

Word-for-word excerpt, not a result. Read the full SKILL.md ↓

Files of /digital-marketing-pro:growth-plan — Part 8 Flagship Deliverable

indranilbanerjee/main1 file shown
SKILL.md
Show the full text240 lines

/digital-marketing-pro:growth-plan — Part 8 Flagship Deliverable

The Growth Plan is the flagship client-facing deliverable. It synthesises every internal document produced in Parts 1–7 into a single 11-section narrative answering: "How will we grow this business digitally, and what will it cost?"

Context efficiency

Heavy skill. Grep before Read any referenced file, then Read only matched ranges with offset + limit. List the brand's data dir (~/.claude-marketing/brands/{slug}/, or $CLAUDE_PLUGIN_DATA/digital-marketing-pro/brands/{slug}/ when that env var is set) before opening files. On re-invocation mid-session, skip files already in context.

Specification: growth-plan-template.md — the canonical 11-section structure.

Pre-conditions

Before producing the Growth Plan, verify:

  1. Parts 1–7 completed in the engagement
  2. Four Core Documents at canonical version (v2 if re-runs happened, v1 otherwise)
  3. Living Project Instruction File current — reflects the current strategic facts
  4. Part 7 Preparation Documents completed — campaign architecture, naming conventions, KPI tree, content pillars, asset inventory, approval chains

If any pre-condition fails, do NOT produce. Instruct the user.

The 11 Sections

# Section Length Source
1 Executive Summary 1 page Synthesis
2 Business Context 2-3 pages Core Doc 3.1 + Part 4.4 + Part 4.2
3 Target Audience 2-3 pages Core Doc 3.2
4 Strategic Positioning 2 pages Core Doc 3.3
5 Channel Strategy 3-4 pages Core Doc 3.4 + Part 9 channel docs
6 Budget & Media Plan 2-3 pages Core Doc 3.4 Step 5 + 9
7 KPI Framework 2 pages Part 7 KPI tree
8 Implementation Timeline 2-3 pages Part 7 + 30/60/90 framework
9 Team & Resource Plan 1-2 pages Engagement context
10 Risk & Contingency 1-2 pages Core Doc 3.1 Step 16
11 Expected Outcomes 2 pages Three-scenario forecasting

Total target length: 20–30 pages. Beyond 30, clients stop reading.

Production process

Step 1: Read source documents

Reading order (canonical version of each):

  1. Living Project Instruction File (current truth)
  2. Core Doc 3.1 Business & SBU Analysis
  3. Core Doc 3.2 Segmentation Framework
  4. Core Doc 3.3 Brand Positioning & Communications
  5. Core Doc 3.4 DMFlow
  6. Part 4 documents (4.1, 4.2, 4.3, 4.4)
  7. Part 7 preparation documents (campaign architecture, KPI tree, content pillars)
Step 2: Synthesise — do not re-state

The Growth Plan is synthesis, not concatenation. Do not copy paragraphs from the Core Docs verbatim. Re-write each section in client-facing narrative form, citing the source document for traceability.

Step 3: Apply the three-scenario discipline

Section 11 (Expected Outcomes) presents Conservative / Moderate / Aggressive scenarios per three-scenario-forecasting.md.

Section 7 (KPI Framework) targets are also presented as three scenarios per KPI.

Step 4: Apply the In-Market vs Out-Market split

Section 5 (Channel Strategy) and Section 6 (Budget & Media Plan) explicitly call out the In-Market vs Out-Market budget allocation per in-market-out-market.md.

Step 5: Apply the 30/60/90 framework

Section 8 (Implementation Timeline) uses the 30/60/90 phasing per 30-60-90-framework.md for the first quarter, then quarterly milestones thereafter.

Step 6: Output

Save to engagements/{id}/part-08-growth-plan/growth-plan.md. Generate companion exports:

  • PDF via the existing pdf-generator.py script
  • DOCX via the existing document export utilities

Section-by-section guidance

Section 1: Executive Summary

The CEO reads this. Make it count.

  • Key findings (3-5 bullets — most important things from analysis)
  • Recommended strategy (1-2 sentences headline)
  • Expected outcomes (moderate scenario, with conservative-aggressive band)
  • Investment required (total budget; fixed + variable breakdown)
  • Timeline (30/60/90 + quarterly milestones in one sentence)
  • The single most important thing the client needs to know
Section 2: Business Context

Set the stage for why the strategy is what it is.

  • Summary of business analysis (Core Doc 3.1) — what the business is, how it makes money, key strengths and constraints
  • Industry landscape — market size, growth trajectory, competitive intensity
  • Competitive position — where the brand sits, key competitors, positioning today
  • Critical assumptions — major Stone facts and validated Opinions
Section 3: Target Audience
  • Primary persona summary in actionable format (6 questions)
  • Secondary persona if relevant
  • Why these personas were chosen (tie back to TG scoring from 3.2)
  • Anti-personas — who we explicitly do NOT target
  • For B2B: Decision-Making Unit summary per persona
Section 4: Strategic Positioning
  • Positioning statement (the formal one-sentence)
  • Brand promise + 3-5 supporting proof points
  • The 3-5 messaging pillars
  • Tone-of-voice profile with one on-tone vs off-tone example
  • Don't-say rules
Section 5: Channel Strategy
  • Channel selection summary (in-scope vs deferred per channel-families.md)
  • Per-channel role (which funnel stage)
  • Channel sequencing logic (which feeds which)
  • In-Market vs Out-Market split with rationale
  • Media mix across paid / organic / earned / owned
Section 6: Budget & Media Plan
Section 7: KPI Framework
  • Primary KPI (the one number that matters most for the period)
  • Secondary KPIs (3-5)
  • Per-channel KPIs
  • KPI targets in three scenarios
  • Reporting cadence per reporting-cadence.md
  • Attribution model used
  • Known measurement limitations
Section 8: Implementation Timeline

30 / 60 / 90-day milestones for the first quarter. Quarterly milestones thereafter.

  • Days 1-30 Foundation
  • Days 31-60 Validation
  • Days 61-90 Optimisation & Scale
  • Q2 milestones
  • Q3 milestones
  • Year-end goals
Section 9: Team & Resource Plan
  • Agency / consulting team roles
  • Client team roles (especially what client must own)
  • External partners
  • Approval workflows and SLAs
  • Critical dependencies that could delay execution
Section 10: Risk & Contingency
  • Top 3-5 risks across market, competitive, regulatory, operational, execution dimensions
  • Per risk: likelihood, impact, mitigation strategy, trigger conditions
  • Contingency budget (typically 10-15% reserve)
  • Decision-making authority for invoking contingency
Section 11: Expected Outcomes
  • Three-scenario forecast (Conservative / Moderate / Aggressive)
  • Per-quarter forecast (Q1, Q2, Q3, Q4)
  • Triggers that move us between scenarios
  • What the team will track to know which scenario is unfolding
  • Conditions under which the plan would be revised

Quality discipline

  1. Every claim cites a source — Core Doc reference with version number
  2. Every projection states assumptions — no naked numbers
  3. Plain language — the CEO is not a marketing specialist
  4. Visual evidence where it helps — charts, scenario tables, timeline diagrams
  5. 20-30 page target — beyond 30, clients stop reading
  6. Consistency with Yearly Planner — the operational calendar from /digital-marketing-pro:yearly-planner must align with this Growth Plan

After production

  1. Save markdown to part-08-growth-plan/growth-plan.md
  2. Generate PDF + DOCX exports
  3. Mark Part 8 sub-complete (Growth Plan); Yearly Planner completion finishes Part 8
  4. Update LIF: Engagement phase = "Strategy approved; Channel Build pending"
  5. Brief: "Growth Plan complete. {N} pages. Run /digital-marketing-pro:yearly-planner to produce the operational companion. After client approval, /digital-marketing-pro:engagement next advances to Part 9 Channel Strategy."

Examples

Example 1: First Growth Plan production

SYNTHETIC EXAMPLE — fabricated for illustration; never reuse these numbers. The INR forecast figures below are made up.

User: Produce the Growth Plan for Acme.

Skill response:
1. Verify pre-conditions: Parts 1-7 completed, Core Docs at v2 ✓
2. Pull from source docs ONE AT A TIME via targeted Read with offset+limit (grep first for the section you need, then Read just that range) — the full corpus is ~95K words, so bulk-reading every doc up front blows the per-skill 5K-token budget
3. Synthesise into 11 sections, ~24 pages
4. Apply three-scenario forecasting in Sections 7 + 11
5. Apply 30/60/90 phasing in Section 8
6. Save markdown + generate PDF + DOCX
7. Mark Growth Plan complete (Yearly Planner pending)
8. Brief: "Growth Plan v1.0 produced. 24 pages. Conservative Q1 forecast: INR 1.8 Cr new ARR; Moderate: INR 2.6 Cr; Aggressive: INR 3.4 Cr. Run /digital-marketing-pro:yearly-planner next."
  • engagement-workflow — orchestrates Part 8
  • yearly-planner — companion deliverable that completes Part 8
  • four-core-documents — produces the canonical Core Docs that feed the Growth Plan
1---
2name: growth-plan
3description: "Produce the Part 8 Growth Plan: one strategy with scenario forecasts and a 30/60/90. \"write the strategy document for the client\""
4user-invocable: true
5allowed-tools: Read Write Edit Bash Glob Grep
6engagement-part: "8"
7view-preference: v2-primary
8---
9 
10# /digital-marketing-pro:growth-plan — Part 8 Flagship Deliverable
11 
12The Growth Plan is the flagship client-facing deliverable. It synthesises every internal document produced in Parts 1–7 into a single 11-section narrative answering: *"How will we grow this business digitally, and what will it cost?"*
13 
14## Context efficiency
15 
16Heavy skill. **Grep before Read** any referenced file, then `Read` only matched ranges with `offset` + `limit`. List the brand's data dir (`~/.claude-marketing/brands/{slug}/`, or `$CLAUDE_PLUGIN_DATA/digital-marketing-pro/brands/{slug}/` when that env var is set) before opening files. On re-invocation mid-session, skip files already in context.
17 
18**Specification:** [growth-plan-template.md](../context-engine/growth-plan-template.md) — the canonical 11-section structure.
19 
20## Pre-conditions
21 
22Before producing the Growth Plan, verify:
23 
241. **Parts 1–7 completed** in the engagement
252. **Four Core Documents at canonical version** (v2 if re-runs happened, v1 otherwise)
263. **Living Project Instruction File current** — reflects the current strategic facts
274. **Part 7 Preparation Documents completed** — campaign architecture, naming conventions, KPI tree, content pillars, asset inventory, approval chains
28 
29If any pre-condition fails, do NOT produce. Instruct the user.
30 
31## The 11 Sections
32 
33| # | Section | Length | Source |
34|---|---------|--------|--------|
35| 1 | Executive Summary | 1 page | Synthesis |
36| 2 | Business Context | 2-3 pages | Core Doc 3.1 + Part 4.4 + Part 4.2 |
37| 3 | Target Audience | 2-3 pages | Core Doc 3.2 |
38| 4 | Strategic Positioning | 2 pages | Core Doc 3.3 |
39| 5 | Channel Strategy | 3-4 pages | Core Doc 3.4 + Part 9 channel docs |
40| 6 | Budget & Media Plan | 2-3 pages | Core Doc 3.4 Step 5 + 9 |
41| 7 | KPI Framework | 2 pages | Part 7 KPI tree |
42| 8 | Implementation Timeline | 2-3 pages | Part 7 + 30/60/90 framework |
43| 9 | Team & Resource Plan | 1-2 pages | Engagement context |
44| 10 | Risk & Contingency | 1-2 pages | Core Doc 3.1 Step 16 |
45| 11 | Expected Outcomes | 2 pages | Three-scenario forecasting |
46 
47Total target length: **20–30 pages**. Beyond 30, clients stop reading.
48 
49## Production process
50 
51### Step 1: Read source documents
52 
53Reading order (canonical version of each):
54 
551. Living Project Instruction File (current truth)
562. Core Doc 3.1 Business & SBU Analysis
573. Core Doc 3.2 Segmentation Framework
584. Core Doc 3.3 Brand Positioning & Communications
595. Core Doc 3.4 DMFlow
606. Part 4 documents (4.1, 4.2, 4.3, 4.4)
617. Part 7 preparation documents (campaign architecture, KPI tree, content pillars)
62 
63### Step 2: Synthesise — do not re-state
64 
65The Growth Plan is **synthesis**, not concatenation. Do not copy paragraphs from the Core Docs verbatim. Re-write each section in client-facing narrative form, citing the source document for traceability.
66 
67### Step 3: Apply the three-scenario discipline
68 
69Section 11 (Expected Outcomes) presents Conservative / Moderate / Aggressive scenarios per [three-scenario-forecasting.md](../context-engine/three-scenario-forecasting.md).
70 
71Section 7 (KPI Framework) targets are also presented as three scenarios per KPI.
72 
73### Step 4: Apply the In-Market vs Out-Market split
74 
75Section 5 (Channel Strategy) and Section 6 (Budget & Media Plan) explicitly call out the In-Market vs Out-Market budget allocation per [in-market-out-market.md](../context-engine/in-market-out-market.md).
76 
77### Step 5: Apply the 30/60/90 framework
78 
79Section 8 (Implementation Timeline) uses the 30/60/90 phasing per [30-60-90-framework.md](../context-engine/30-60-90-framework.md) for the first quarter, then quarterly milestones thereafter.
80 
81### Step 6: Output
82 
83Save to `engagements/{id}/part-08-growth-plan/growth-plan.md`. Generate companion exports:
84 
85- PDF via the existing `pdf-generator.py` script
86- DOCX via the existing document export utilities
87 
88## Section-by-section guidance
89 
90### Section 1: Executive Summary
91 
92The CEO reads this. Make it count.
93 
94- Key findings (3-5 bullets — most important things from analysis)
95- Recommended strategy (1-2 sentences headline)
96- Expected outcomes (moderate scenario, with conservative-aggressive band)
97- Investment required (total budget; fixed + variable breakdown)
98- Timeline (30/60/90 + quarterly milestones in one sentence)
99- The single most important thing the client needs to know
100 
101### Section 2: Business Context
102 
103Set the stage for why the strategy is what it is.
104 
105- Summary of business analysis (Core Doc 3.1) — what the business is, how it makes money, key strengths and constraints
106- Industry landscape — market size, growth trajectory, competitive intensity
107- Competitive position — where the brand sits, key competitors, positioning today
108- Critical assumptions — major Stone facts and validated Opinions
109 
110### Section 3: Target Audience
111 
112- Primary persona summary in actionable format (6 questions)
113- Secondary persona if relevant
114- Why these personas were chosen (tie back to TG scoring from 3.2)
115- Anti-personas — who we explicitly do NOT target
116- For B2B: Decision-Making Unit summary per persona
117 
118### Section 4: Strategic Positioning
119 
120- Positioning statement (the formal one-sentence)
121- Brand promise + 3-5 supporting proof points
122- The 3-5 messaging pillars
123- Tone-of-voice profile with one on-tone vs off-tone example
124- Don't-say rules
125 
126### Section 5: Channel Strategy
127 
128- Channel selection summary (in-scope vs deferred per [channel-families.md](../context-engine/channel-families.md))
129- Per-channel role (which funnel stage)
130- Channel sequencing logic (which feeds which)
131- In-Market vs Out-Market split with rationale
132- Media mix across paid / organic / earned / owned
133 
134### Section 6: Budget & Media Plan
135 
136- Total monthly fixed budget
137- Variable budget envelope per [fixed-vs-variable-budget.md](../context-engine/fixed-vs-variable-budget.md)
138- Per-channel allocation table with rationale
139- Quarterly budget pacing
140- Year-1 total investment
141- Investment vs expected return (LTV:CAC math per [unit-economics-framework.md](../context-engine/unit-economics-framework.md))
142 
143### Section 7: KPI Framework
144 
145- Primary KPI (the one number that matters most for the period)
146- Secondary KPIs (3-5)
147- Per-channel KPIs
148- KPI targets in three scenarios
149- Reporting cadence per [reporting-cadence.md](../context-engine/reporting-cadence.md)
150- Attribution model used
151- Known measurement limitations
152 
153### Section 8: Implementation Timeline
154 
15530 / 60 / 90-day milestones for the first quarter. Quarterly milestones thereafter.
156 
157- Days 1-30 Foundation
158- Days 31-60 Validation
159- Days 61-90 Optimisation & Scale
160- Q2 milestones
161- Q3 milestones
162- Year-end goals
163 
164### Section 9: Team & Resource Plan
165 
166- Agency / consulting team roles
167- Client team roles (especially what client must own)
168- External partners
169- Approval workflows and SLAs
170- Critical dependencies that could delay execution
171 
172### Section 10: Risk & Contingency
173 
174- Top 3-5 risks across market, competitive, regulatory, operational, execution dimensions
175- Per risk: likelihood, impact, mitigation strategy, trigger conditions
176- Contingency budget (typically 10-15% reserve)
177- Decision-making authority for invoking contingency
178 
179### Section 11: Expected Outcomes
180 
181- Three-scenario forecast (Conservative / Moderate / Aggressive)
182- Per-quarter forecast (Q1, Q2, Q3, Q4)
183- Triggers that move us between scenarios
184- What the team will track to know which scenario is unfolding
185- Conditions under which the plan would be revised
186 
187## Quality discipline
188 
1891. **Every claim cites a source** — Core Doc reference with version number
1902. **Every projection states assumptions** — no naked numbers
1913. **Plain language** — the CEO is not a marketing specialist
1924. **Visual evidence where it helps** — charts, scenario tables, timeline diagrams
1935. **20-30 page target** — beyond 30, clients stop reading
1946. **Consistency with Yearly Planner** — the operational calendar from `/digital-marketing-pro:yearly-planner` must align with this Growth Plan
195 
196## After production
197 
1981. Save markdown to `part-08-growth-plan/growth-plan.md`
1992. Generate PDF + DOCX exports
2003. Mark Part 8 sub-complete (Growth Plan); Yearly Planner completion finishes Part 8
2014. Update LIF: Engagement phase = "Strategy approved; Channel Build pending"
2025. Brief: "Growth Plan complete. {N} pages. Run /digital-marketing-pro:yearly-planner to produce the operational companion. After client approval, /digital-marketing-pro:engagement next advances to Part 9 Channel Strategy."
203 
204## Examples
205 
206### Example 1: First Growth Plan production
207 
208*SYNTHETIC EXAMPLE — fabricated for illustration; never reuse these numbers. The INR forecast figures below are made up.*
209 
210```
211User: Produce the Growth Plan for Acme.
212 
213Skill response:
2141. Verify pre-conditions: Parts 1-7 completed, Core Docs at v2 ✓
2152. Pull from source docs ONE AT A TIME via targeted Read with offset+limit (grep first for the section you need, then Read just that range) — the full corpus is ~95K words, so bulk-reading every doc up front blows the per-skill 5K-token budget
2163. Synthesise into 11 sections, ~24 pages
2174. Apply three-scenario forecasting in Sections 7 + 11
2185. Apply 30/60/90 phasing in Section 8
2196. Save markdown + generate PDF + DOCX
2207. Mark Growth Plan complete (Yearly Planner pending)
2218. Brief: "Growth Plan v1.0 produced. 24 pages. Conservative Q1 forecast: INR 1.8 Cr new ARR; Moderate: INR 2.6 Cr; Aggressive: INR 3.4 Cr. Run /digital-marketing-pro:yearly-planner next."
222```
223 
224## Related skills
225 
226- `engagement-workflow` — orchestrates Part 8
227- `yearly-planner` — companion deliverable that completes Part 8
228- `four-core-documents` — produces the canonical Core Docs that feed the Growth Plan
229 
230## Related references
231 
232- [growth-plan-template.md](../context-engine/growth-plan-template.md) — canonical 11-section structure
233- [three-scenario-forecasting.md](../context-engine/three-scenario-forecasting.md) — Sections 7 + 11
234- [in-market-out-market.md](../context-engine/in-market-out-market.md) — Sections 5 + 6
235- [fixed-vs-variable-budget.md](../context-engine/fixed-vs-variable-budget.md) — Section 6
236- [unit-economics-framework.md](../context-engine/unit-economics-framework.md) — Section 6
237- [30-60-90-framework.md](../context-engine/30-60-90-framework.md) — Section 8
238- [reporting-cadence.md](../context-engine/reporting-cadence.md) — Section 7
239- [channel-families.md](../context-engine/channel-families.md) — Section 5
240 

Discussion

Alternatives